All works are executed under control experience specialists, that provides the quality cleaning, high technical indexes after implementation of works and lasting exploitation of the cleared equipment.
№ | The enterprise name | The equipment on which indicative works were made | Conclusions |
1 | Achinsk oil refining factory, LLC | Clearing of an internal surface of tubes of heat-exchange equipment, refrigerators and air-cooling devices. | High clearing speed, clearing of completely hammered tubes, no mechanical damages. |
2 | Zainsk state regional power station Tatenergo, PLC | Clearing of an internal surface of tubes of the condenser 200KCCx2 block К-200-130 | Tubes were cleared to metal color that is unattainable when clearing with Atjumat sets. The temperature was about 5.7 С at 11.1 С norm. |
3 | Mironovsk thermal power station | Clearing of an internal surface of tubes of the condenser | Cleaning of one tube for 3 minutes. No damages. |
4 | The South Ukraine nuclear power station | Clearing of an internal surface of tubes of the condenser | Clearing of one tube for 60-80 sec. No damages. |
5 | Port factory in Odessa | Clearing of an internal surface of tubes of E-905 low pressure refrigerator and Е-201 stripper. | Purification of a refrigerator of 97 %, purification of stripper 95 %, cleaning of a refrigerator for 5 min, cleaning of stripper for 15 min. No damages. |
6 | Ukrtatnafta, PLC | Clearing of an internal surface of tubes of heat exchangers of plot G-36/37T-23 and G-37T-18 | 97 % purification. Cleaning of one tube for 1 minute. No damages. |
7 | Gnidyntsi GPP | Clearing of an internal surface of tubes of the heat exchanger Т5/1 | 97% purification. Cleaning of one tube for 9 minutes. No damages. |
8 | Linos, PLC | Clearing of an internal surface of tubes of steam-convertor P-870 | 97% purification. Cleaning of one tube for 1 minute. No damages. |
9 | South Balyksky gas-processing complex, PLC | Clearing of an internal surface of tubes of section АВО Т-1ОB | 95 % purification. Cleaning of one tube for 1 minute. No damages. |
10 | Sibur-Himprom, PLC | Clearing of an internal surface of tubes of the heat exchanger Т-54 | 95% purification. Cleaning of one tube for 1 minute. No damages. |
11 | Rovno nuclear power station | Clearing of an internal surface of tubes of the condenser K-1000-60/3000b.№3 | 95% purification. Cleaning of one tube for 1 minutes. No damages. |
12 | Chernigov himvolokno, PLC | Clearing of an internal surface of tubes of the evaporator ITK-300, heat exchanger KTV-250 | 97 % purification. Cleaning of one tube for 2-4 minute. No damages. |
13 | Ukrneft, PLC Kachanov gas-processing complex | Clearing of an internal surface of tubes of the heat exchanger HK-1200 | 97% purification. Cleaning of one tube for 12 minutes. No damages. |
14 | Zaporozhye nuclear power station | Clearing of an internal surface of tubes of the heat exchanger PEM | 97 % purification. Cleaning of one tube for 40-50 seconds. No damages. |
15 | Khmelnitskiy nuclear power station | Clearing of an internal surface of tubes of unboiled water heater (JUC1OWO1) | Cleared to an initial condition. Cleaning of one tube for 40-50 seconds. No damages. |
16 | Novo-Irkutsk CHP | Clearing of an internal surface of tubes of ashes adjournment | Decrease of the leaving gases temperature on 10-20 С. Increase of the efficiency. Decrease of air heater resistance on 30-40 kg*s/m2. |
17 | Krasnoyarsk CHP-1 | Cleaning of internal surface of PSV-500 tubes | 97% purification. Cleaning of one tube for 3 minutes. No damage. |
18 | Krasnoyarsk CHP-3 | Cleaning of internal surface of 1200ETNV tubes | All work has been done in time with good quality. |
19 | Sosnovyi Bor CHP | Cleaning of internal surface of VZP tubes from ash deposits | All work has been done very quickly – 8 days ahead of deadline. |
20 | Iriklinsk GRES, PLC | Cleaning of internal surface of tubes of K-300-240LMZ condensor on power block №7 | 97% purification. Cleaning of one tube for 1 minute. No damage. |
21 | Mednogorsk copper-sulfur combine, LLC | Cleanint of internal surface of air-coolers tubes | 96% purification. Cleaning of one tube for 2 minutes. No damage |
22 | Belozersk gas-processing complex | Cleaning of internal surface of boilers tubes | 95% purification. 2 m per minute cleaning speed. Solid deposits. |
23 | Minudobreniya, PLC | Cleaning of internal surface of evaporators and water condensors on thermal power station | 96% purification. Cleaning of one tube for 2 minutes. No damage |
24 | Makeevka coke plant them. Dzherzhinsky, PLC | Cleaning of internal surfaces of UGS. Condensors cleaning in rectification and bensol workshops. | 97% purification. Cleaning of one tube for 1 minute. No damage. |
25 | Starobeshevsk thermal power station Vostokenergo, PLC | Cleaning of turbine condensers | 96% purification. Cleaning of one tube for 2 minutes. No damage. |
26 | MQM them. Dzherzhinsky, PLC | Boiler cleaning | 95% purification. 2 m per minute cleaning speed. No damage. |
27 | Dneprodzerzhinsk metallurgic combine, PLC | Boiler cleaning in convector workshop | 97% purification. 2 m per minute cleaning speed. No damage. |
28 | Enakievo metallurgic plant, PLC | Condensers cleaning | 97% purification. Cleaning of one tube for 2 minutes. No damage. |
29 | Zmiev thermal power station | Cleaning of heat-exchange equipment of entire power station | 96% purification. Cleaning of one tube for 2 minutes. No damage. |
30 | Kurakhov thermal power station | Cleaning of turbine condensers | 97% purification. Cleaning of one tube for 2 minutes. No damage. |